<?xml version="1.0"?>
<law><site_title>Virginia Decoded</site_title><site_url>https://vacode.org</site_url><law_id>364420</law_id><section_number>45.2-725</section_number><catch_line> Explosives and blasting practices in shaft and slope operations</catch_line><edition url="https://vacode.org/2026/" slug="2026" current="TRUE" last_updated="2026-08-02">2026</edition><structure><unit label="title" level="1" order_by="99" identifier="45.2">Mines, Minerals, and Energy</unit><unit label="subtitle" level="2" order_by="2" identifier="II">Coal Mining</unit><unit label="part" level="3" order_by="2" identifier="B">Underground Coal Mines</unit><unit label="chapter" level="4" order_by="1" identifier="7">Requirements Applicable to Underground Coal Mines; Mine Construction</unit><unit label="article" level="5" order_by="5" identifier="5">Explosives and Blasting</unit></structure><text>
						<section id="A"><p><span class="prefix-number">A.</span> Every blasting area in a shaft or slope operation shall be covered with mats or <span class="dictionary">materials</span> when the excavations are too shallow to retain the blasted <span class="dictionary">material</span>. <a id="paragraph-1357690" class="section-permalink" href="https://vacode.org/45.2-725/#A"><i class="fa fa-link"/></a></p></section>
						<section id="B"><p><span class="prefix-number">B.</span> If explosives are in the shaft or slope when an electrical storm approaches, every miner shall be removed from the working place until the storm has passed. <a id="paragraph-1357691" class="section-permalink" href="https://vacode.org/45.2-725/#B"><i class="fa fa-link"/></a></p></section></text><history>1978, c. 729, &#xA7; 45.1-53.1; 1994, c. 28, &#xA7; 45.1-161.132; 2021, Sp. Sess. I, c. 387.</history><metadata></metadata></law>
