<?xml version="1.0"?>
<law><site_title>Virginia Decoded</site_title><site_url>https://vacode.org</site_url><law_id>354064</law_id><section_number>21-325</section_number><catch_line>Complete survey</catch_line><edition url="https://vacode.org/2026/" slug="2026" current="TRUE" last_updated="2026-08-02">2026</edition><structure><unit label="title" level="1" order_by="58" identifier="21">Drainage, Soil Conservation, Sanitation and Public Facilities Districts</unit><unit label="chapter" level="2" order_by="6" identifier="6">Drainage Projects</unit></structure><text>
						<section><p>After the district is preliminarily established the <span class="dictionary">court</span> shall refer the report of the board of viewers back to them, and unless United States or state engineers have already surveyed the district or the major portion thereof, may make a complete survey, plans and specifications for the drainage or levees, and fix a time when the board of viewers shall complete and file their report, not exceeding six months; but such time may be extended by the <span class="dictionary">court</span> for good cause shown, either before or after the expiration of the time.</p></section></text><history>Code 1919, &#xA7; 1749; 1920, p. 607.</history><metadata></metadata></law>
