{"formats":[{"name":"JSON","format":"json","url":"\/downloads\/2026\/code-json\/62.1-93.json"},{"name":"Plain Text","format":"text","url":"\/downloads\/2026\/code-text\/62.1-93.txt"},{"name":"XML","format":"xml","url":"\/downloads\/2026\/code-xml\/62.1-93.xml"},{"name":"HTML","format":"html","url":"\/downloads\/2026\/code-html\/62.1-93.html"}],"law_id":375261,"edition_id":2,"section_id":375261,"structure_id":53278,"section_number":"62.1-93","catch_line":"Time limits on construction of proposed dam and works","history":"Code 1950, \u00a7 62-82; 1968, c. 659.","full_text":"With respect to any license which may be granted, the Commission shall prescribe a time limit of not more than two years after the granting of such license for the commencement of the construction of the proposed dam and works of the applicant and of not more than five years after the granting of such license for the completion of such dam and works, either or both of which initial time limits may be extended for good cause from time to time in the discretion of the Commission.\n\n","order_by":null,"text":{"0":{"id":1400838,"text":"With respect to any license which may be granted, the Commission shall prescribe a time limit of not more than two years after the granting of such license for the commencement of the construction of the proposed dam and works of the applicant and of not more than five years after the granting of such license for the completion of such dam and works, either or both of which initial time limits may be extended for good cause from time to time in the discretion of the Commission.","type":"section","prefixes":[""],"prefix":"","entire_prefix":"","prefix_anchor":"","level":1}},"ancestry":[{"id":53278,"edition_id":2,"name":"Water-Power Development, Conservation of Hydroelectric Power Dams and Works","identifier":"7","label":"chapter","depth":2,"order_by":22,"parent_id":53275,"metadata":{"child_laws":25,"child_structures":0},"date_created":"2026-08-02 03:14:05","date_modified":"2026-08-02 12:36:52","permalink":{"id":1497451,"object_type":"structure","relational_id":53278,"identifier":"7","token":"62.1\/7","url":"\/62.1\/7\/","edition_id":2,"permalink":0,"preferred":1}},{"id":53275,"edition_id":2,"name":"Waters of the State, Ports and Harbors","identifier":"62.1","label":"title","depth":1,"order_by":132,"parent_id":null,"metadata":{"child_laws":578,"child_structures":74},"date_created":"2026-08-02 03:14:05","date_modified":"2026-08-02 12:36:41","permalink":{"id":1495201,"object_type":"structure","relational_id":53275,"identifier":"62.1","token":"62.1","url":"\/62.1\/","edition_id":2,"permalink":0,"preferred":1}}],"structure_contents":[{"id":374692,"structure_id":53278,"section_number":"62.1-100","catch_line":"Rules of Commission; reports; employment of experts, etc","url":"\/62.1-100\/","token":"62.1\/7\/62.1-100","metadata":false},{"id":374693,"structure_id":53278,"section_number":"62.1-101","catch_line":"Licenses not affected by alteration, amendment or repeal of chapter","url":"\/62.1-101\/","token":"62.1\/7\/62.1-101","metadata":false},{"id":374694,"structure_id":53278,"section_number":"62.1-102","catch_line":"Alteration or amendment of license","url":"\/62.1-102\/","token":"62.1\/7\/62.1-102","metadata":false},{"id":374695,"structure_id":53278,"section_number":"62.1-103","catch_line":"Jurisdiction of United States","url":"\/62.1-103\/","token":"62.1\/7\/62.1-103","metadata":false},{"id":375246,"structure_id":53278,"section_number":"62.1-80","catch_line":"Declaration of public policy","url":"\/62.1-80\/","token":"62.1\/7\/62.1-80","metadata":false},{"id":375245,"structure_id":53278,"section_number":"62.1-80.1","catch_line":"Applicability of chapter","url":"\/62.1-80.1\/","token":"62.1\/7\/62.1-80.1","metadata":false},{"id":375247,"structure_id":53278,"section_number":"62.1-81","catch_line":"\"Waters of the Commonwealth\" defined","url":"\/62.1-81\/","token":"62.1\/7\/62.1-81","metadata":false},{"id":375248,"structure_id":53278,"section_number":"62.1-82","catch_line":"Control and regulation by State Corporation Commission; existing rights of riparian owners","url":"\/62.1-82\/","token":"62.1\/7\/62.1-82","metadata":false},{"id":375249,"structure_id":53278,"section_number":"62.1-83","catch_line":"Dams across waters of Commonwealth","url":"\/62.1-83\/","token":"62.1\/7\/62.1-83","metadata":false},{"id":375250,"structure_id":53278,"section_number":"62.1-84","catch_line":"What \"dam\" includes","url":"\/62.1-84\/","token":"62.1\/7\/62.1-84","metadata":false},{"id":375251,"structure_id":53278,"section_number":"62.1-85","catch_line":"License required to construct dam; application","url":"\/62.1-85\/","token":"62.1\/7\/62.1-85","metadata":false},{"id":375252,"structure_id":53278,"section_number":"62.1-86","catch_line":"Notice of hearing on application","url":"\/62.1-86\/","token":"62.1\/7\/62.1-86","metadata":false},{"id":375253,"structure_id":53278,"section_number":"62.1-87","catch_line":"Proceedings at hearing","url":"\/62.1-87\/","token":"62.1\/7\/62.1-87","metadata":false},{"id":375254,"structure_id":53278,"section_number":"62.1-88","catch_line":"Determination and investigation by Commission","url":"\/62.1-88\/","token":"62.1\/7\/62.1-88","metadata":false},{"id":375255,"structure_id":53278,"section_number":"62.1-89","catch_line":"When license granted","url":"\/62.1-89\/","token":"62.1\/7\/62.1-89","metadata":false},{"id":375258,"structure_id":53278,"section_number":"62.1-90","catch_line":"Rejection of application; requiring applicant to modify plans","url":"\/62.1-90\/","token":"62.1\/7\/62.1-90","metadata":false},{"id":375259,"structure_id":53278,"section_number":"62.1-91","catch_line":"Terms and conditions of license; preventing obstruction of navigation or flow; dams across navigable waters of United States","url":"\/62.1-91\/","token":"62.1\/7\/62.1-91","metadata":false},{"id":375260,"structure_id":53278,"section_number":"62.1-92","catch_line":"Priority of location or appropriation; notice to owners of existing developments","url":"\/62.1-92\/","token":"62.1\/7\/62.1-92","metadata":false},{"id":375261,"structure_id":53278,"section_number":"62.1-93","catch_line":"Time limits on construction of proposed dam and works","url":"\/62.1-93\/","token":"62.1\/7\/62.1-93","metadata":false},{"id":375262,"structure_id":53278,"section_number":"62.1-94","catch_line":"Duration of licenses; acquisition of developments by Commonwealth","url":"\/62.1-94\/","token":"62.1\/7\/62.1-94","metadata":false},{"id":375263,"structure_id":53278,"section_number":"62.1-95","catch_line":"Value of license not to be estimated in valuation for rate making, etc.; intangible water-power value","url":"\/62.1-95\/","token":"62.1\/7\/62.1-95","metadata":false},{"id":375264,"structure_id":53278,"section_number":"62.1-96","catch_line":"Transfer or assignment of license","url":"\/62.1-96\/","token":"62.1\/7\/62.1-96","metadata":false},{"id":375265,"structure_id":53278,"section_number":"62.1-97","catch_line":"Proceedings on violation of terms of license or of provisions of chapter or regulations","url":"\/62.1-97\/","token":"62.1\/7\/62.1-97","metadata":false},{"id":375266,"structure_id":53278,"section_number":"62.1-98","catch_line":"Right of eminent domain of public service corporations","url":"\/62.1-98\/","token":"62.1\/7\/62.1-98","metadata":false},{"id":375267,"structure_id":53278,"section_number":"62.1-99","catch_line":"Water-power developments constructed or acquired prior to certain date","url":"\/62.1-99\/","token":"62.1\/7\/62.1-99","metadata":false}],"previous_section":{"id":375260,"structure_id":53278,"section_number":"62.1-92","catch_line":"Priority of location or appropriation; notice to owners of existing developments","url":"\/62.1-92\/","token":"62.1\/7\/62.1-92","metadata":false},"next_section":{"id":375262,"structure_id":53278,"section_number":"62.1-94","catch_line":"Duration of licenses; acquisition of developments by Commonwealth","url":"\/62.1-94\/","token":"62.1\/7\/62.1-94","metadata":false},"metadata":false,"official_url":"https:\/\/law.lis.virginia.gov\/vacode\/62.1-93\/","history_text":"<p>The record of this law\u2019s original creation isn\u2019t available online. It has been modified 1 time. Those modifications are cataloged by \u201cThe Acts of Assembly,\u201d a state publication, by year and chapter. Those modifications that can be read on the General Assembly\u2019s website will be linked accordingly. That modification is as follows: in 1968, chapter 659.<\/p>","references":false,"refers_to":false,"permalink":{"id":1497525,"object_type":"law","relational_id":375261,"identifier":"62.1-93","token":"62.1\/7\/62.1-93","url":"\/62.1-93\/","edition_id":2,"permalink":0,"preferred":1},"url":"\/62.1-93\/","token":"62.1\/7\/62.1-93","dublin_core":{"Title":"Time limits on construction of proposed dam and works","Type":"Text","Format":"text\/html","Identifier":"\u00a7 62.1-93","Relation":"Code of Virginia"},"html":"\n\t\t\t\t\t\t<section><p>With respect to any license which may be granted, the Commission shall prescribe a time limit of not more than two years after the granting of such license for the commencement of the construction of the proposed dam and works of the applicant and of not more than five years after the granting of such license for the completion of such dam and works, either or both of which initial time limits may be extended for good cause from time to time in the discretion of the Commission.<\/p><\/section>","plain_text":"                                 CODE OF VIRGINIA\n\nTIME LIMITS ON CONSTRUCTION OF PROPOSED DAM AND WORKS (\u00a7 62.1-93)\n\nWith respect to any license which may be granted, the Commission shall prescribe\na time limit of not more than two years after the granting of such license for\nthe commencement of the construction of the proposed dam and works of the\napplicant and of not more than five years after the granting of such license for\nthe completion of such dam and works, either or both of which initial time\nlimits may be extended for good cause from time to time in the discretion of the\nCommission.\n\nHISTORY: Code 1950, \u00a7 62-82; 1968, c. 659.","edition":{"id":2,"name":"2026","slug":"2026","date_created":"2026-07-16 18:40:23","date_modified":"2026-08-02 15:14:36","current":1,"order_by":2,"last_import":"2026-08-02 12:37:30"}}